Manufacturing service
CNC Machining
Drawing-based CNC machining sourcing for prototypes and production parts.
What buyers should provide
2D/3D drawings, material, tolerance, finish, quantity and target delivery date. Include critical tolerances, GD&T, surface finish, inspection reports and applicable standards where required.
Manufacturing examples
Representative manufacturing imagery for capability reference. Final scope and suitability remain subject to project review.






Precision & Quality
Final tolerance capability depends on material, geometry, feature size and drawing requirements. Critical dimensions should be identified in the RFQ.
Precision / Tolerance
- General machining tolerance
- Project-specificFinal capability depends on material, geometry, feature size and drawing requirements.
- Tight-tolerance features
- Project-specificAvailable for selected features after drawing and inspection review.
- GD&T
- Project-specificPosition, profile, flatness, parallelism, perpendicularity, concentricity and runout may be reviewed where defined.
- Surface roughness
- Project-specificSpecify the required Ra value and measurement location on the drawing.
- Threads and fits
- Project-specificSpecify thread standard, fit class, mating part and inspection requirement.
Inspection
- Dimensional inspection
- Project-specificInspection method is selected according to feature geometry and tolerance.
- CMM, optical and roughness measurement
- Pending verificationEquipment availability must be verified for the requested part and report.
Applicable Standards
- ISO 2768
- Project-specificGeneral tolerances may follow ISO 2768 where specified and applicable; no class is assumed.
- ISO 1101 or ASME Y14.5
- Project-specificCustomer-defined GD&T conventions may be reviewed before quotation.
Quality Documentation
- Dimensional inspection report
- Available on requestReport scope and critical characteristics must be agreed before quotation.
- First article inspection
- Project-specificSampling plan, report format and acceptance criteria depend on the project.
- Material certificate
- Available on requestAvailability depends on the selected material, supplier and order requirement.
- Batch or lot traceability
- Project-specificDefine traceability and retention requirements before quotation.
Technical note: Final manufacturability, tolerances, inspection methods and applicable standards are confirmed after review of the drawing, material, geometry, quantity and application requirements.
Technical confirmation
Manufacturability, materials, tolerances, finishes, documentation and delivery requirements are subject to drawing review and project confirmation. Upload drawings and project files with your RFQ for the most useful response.
Related joining materials
Where relevant to a manufacturing or assembly requirement, browse ORVEXYN’s industrial joining materials. Material suitability remains subject to application confirmation.
